Description
Galesville Fire Station is a 11,300 SF facility completed in 2020. The station contains three drive-thru bays, sleeping quarters, lockers, kitchen, communication and other support areas. The building design utilizes a pre-engineered building structural framing system and is fully sprinklered in accordance with NFPA 1 and 13. This project required a fire signal, and a well and septic system.
The building is designed to achieve a LEED Silver certification.